2017. Žilinskis & Co. carried out the for renovation (modernisation) works of the apartment building at Ganyklų g. 53 in Palanga. With the cooperation of the client and the residents, the modernisation works were successfully completed and handed over within 4 months from the start of the works. The name of Žilinskis & Co company….
Client: Palanga City Municipality Administration 2017 Žilinskis and Co carried out renovation (modernisation) works in a multi-apartment residential building at Ganyklų Street. 53 Palanga. With the cooperation of the client and the residents, the modernisation works were successfully completed and handed over within 4 months from the start of the works. The name of Žilinskis….
Client: Vilnius Development Company The first comprehensive redevelopment of public spaces in the Žirmūnai residential area in the modern history of Vilnius has been completed. New pedestrian and bicycle paths, sports and active recreation areas, recreational pedestrian paths were installed. Also, part of M. Katkaus Street was also reconstructed with storm water networks and new….
Client: Vilnius District Municipality Administration The aim of the project was to create a marketplace for the sale of food products in shelters or from vehicles adapted for the food trade (with or without refrigerators, depending on the products sold). Places were also to be provided for the sale of non-food products (clothing, tools, etc.)….
Client: Litgrid AB Reconstruction of 42 km of overhead power line, including replacement of the lightning protection cable with a fibre optic cable (FOC). 125 reinforced concrete piers replaced with metal ones. The total weight of the piers is 2 500 tonnes. 330 kV substations have also been reconstructed. The project was named the winner….
Užsakovas: Litgrid AB Replacement of two 250 MVA transformers at the Šiauliai substation, ensuring reliable operation of the 330 kV electricity transmission network in Northern Lithuania.
Client: Litgrid AB A 55 km long overhead power line was reconstructed, including the replacement of a lightning protection cable with a fibre-optic cable (FPC). 179 reinforced concrete supports have been replaced by metal ones. The total weight of the metal supports is 3 300 tonnes. At the same time, a 330 kV substation was….
På uppdrag av “Litgrid AB” har vi utfört projekteringsarbetet för den första fasen av utbyggnaden av “LitPol Link”. “LitPol Link” – är ett strategiskt elprojekt som förbinder elinfrastrukturen i de baltiska staterna och Västeuropa. I projektet “LitPol Link” ingår en ombyggnad av 400 kV AS för att ansluta nya 410/345/10 kV 600 MVA autotransformatorer. Två….
Construction of a double-circuit overhead power line between Lithuania and Poland. A 51 km long overhead line was commissioned in the fall of 2015. The new line connected Lithuania with Poland, thus integrating the Baltic States’ energy system with the Western European electricity system.