For several years, Projects and Co has been actively participating in and carrying out design works in Sweden. Every year, we gain more trust from clients and sign cooperation agreements with companies such as: Ellevio AB, E.ON Energidistribution AB, E.ON Elnat Sverige AB, Markbygden Net AB, thus gaining more experience. Some of the most recent projects completed/underway:
- Project for the construction of a 130 kV overhead power line between Kråktorpet and Nylandsbergen (length 31 km)
- Project for the construction of a 130 kV overhead power line between Kråktorpet-Nysäter (length 18 km)
- Project for the construction of a 130 kV overhead power line between Nysäter-Jenåsen (length 18 km)
- Sjöhammaren 130/30 kV transformer substation construction project (2x80 MVA)
30+
Metų patirties
300+
Inžinierių komanda
3000+
Atliktų projektų
Šiuo metu A. Žilinskio ir ko UAB įmonių grupėje dirba apie 600 profesionalų, iš kurių daugiau nei 80 proc. turi aukštąjį inžinerinį, inžinerinį arba profesinį techninį išsilavinimą. Įmonės turimi resursai ir ilgametė darbo patirtis leidžia laiku ir pirmuoju bandymu įvykdyti projektus, kurių vertė yra 20 milijonų eurų ir daugiau.