Reconstruction of 330 kV overhead power line between Elektrėnai Power Plant and Vilnius.

Reconstruction of a 42 km long overhead power line while replacing at the same time a fibre optic cable of a lightning conductor cable. 125 reinforced concrete supports were replaced with metal ones. The total weight of the metal supports is 2,500 tons. 330kv substations were also reconstructed.

The Project was recognized as the winner in the category of small projects at Tekla BIM awards 2019.